4 CUSTOMER CASES
How Manufacturing Companies Save Money with PLEET Stop
From small subcontractors to large packaging manufacturers—here are four concrete examples of how reduced downtime impacts the bottom line.
CASE 1
Small metalworking company – 5 employees
155,250 DKK
savings per year
Payback:
7 months
CASE 2
Medium-sized metalworking company – 19 employees
164,736 DKK
savings per year
Payback:
4 months
CASE 3
Large metalworking company – 50+ employees
531,590 DKK
savings per year
Payback:
1 month
CASE 4
Packaging Production – 40+ employees
314,400 DKK
savings per year
Payback:
7 months
Case 1
Small metalworking company
Machining of metal and/or plastic workpieces
5
5 employees
A smaller, more efficient organization
7
7x STAR Long-Turners
Requires I/O modules for data acquisition
2
2x 3-axis CNC machining centers
Part of the overall fleet of machinery
9
9 machines in total
Basis for the calculation
The Challenge
15 hours per month
On average, each machine was idle for 15 hours per month due to downtime or changeover times that lasted longer than expected.
The Solution: PLEET Stop
-25%
PLEET Stop reduces downtime by 25% —equivalent to 3 hours and 45 minutes more production time per machine each month.
1,620 metric tons
621,000 DKK
405 t
155,250 DKK
COSTS FOR PLEET
147,000 DKK
135,000 DKK
NET VALUE
8,250 DKK
20,250 DKK
7 months
7 months
Case 2
Medium-sized metalworking company
Machining of metal and/or plastic workpieces · two-shift schedule
19
19 employees
Several machines are operating on a two-shift schedule
3
3x Long-turners
Requires I/O modules for data acquisition
4
4 x 3-axis CNC machining centers
Part of the overall fleet of machinery
1
1 x 4-axis CNC machining center
Part of the overall fleet of machinery
2
2 5-axis CNC machining centers
Part of the overall fleet of machinery
10
10 machines in total
Basis for the calculation
The Challenge
12 hours per month
On average, each machine was idle for 12 hours per month due to downtime or changeover times that lasted longer than expected.
The Solution: PLEET Stop
-22%
PLEET Stop reduces downtime by 22% —equivalent to 3 hours and 45 minutes more production time per machine each month.
1,440 metric tons
823,680 DKK
288 t
164,736 DKK
COSTS FOR PLEET
158,000 DKK
150,000 DKK
NET WORTH
9,736 DKK
14,736 DKK
4 months
4 months
Case 3
Large metalworking company
Machining of metal and/or plastic workpieces · 3-shift schedule
50+
50+ employees
Several machines are operating on a three-shift schedule
2
2 x Long-turners
Requires I/O modules for data acquisition
7
7 x 3-axis CNC machining centers
Part of the overall fleet of machinery
8
8 x 4-axis CNC machining centers
Part of the overall fleet of machinery
7
7 x 5-axis CNC machining centers
Part of the overall fleet of machinery
24
24 machines in total
Basis for the calculation
The Challenge
12 hours per month
On average, each machine was idle for 12 hours per month due to downtime or changeover times that lasted longer than expected.
The Solution: PLEET Stop
-20%
PLEET Stop reduces downtime by 20% —equivalent to more than 2½ hours more production time per machine each month.
3,456 t
2,416,320 DKK
760 metric tons
531,590 DKK
COSTS FOR PLEET
221,000 DKK
216,000 DKK
NET WORTH
310,590 DKK
315,590 DKK
1 month
1 month
Case 4
Food Packaging Production
Vacuum forming and injection molding · 3-shift schedule
40+
40+ employees
Several machines are operating on a three-shift schedule
15
15 vacuum forming machines
8
8 injection molding machines
23
23 machines in total
The Challenge
12 hours per month
On average, each machine was idle for 12 hours per month due to downtime or changeover times that lasted longer than expected.
The Solution: PLEET Stop
-20%
PLEET Stop reduces downtime by 20% —equivalent to more than 2½ hours more production time per machine each month.
5,520 metric tons
1,572,000 DKK
1,104 t
314,400 DKK
COSTS FOR PLEET
269,500 DKK
207,000 DKK
NET WORTH
44,900 DKK
107,400 DKK
7 months
7 months
Customer testimonial:
“We’ve seen a significant improvement in our production since we installed PLEET. The time spent on production downtime has been reduced to such an extent that it’s making a difference on the bottom line.” “
– Claus Kvist, Plant manager, ST PLAST A/S