4 CUSTOMER CASES
How Manufacturing Companies Can Save Money with PLEET Stop
From small subcontractors to large packaging manufacturers—here are four concrete examples of how reduced downtime impacts the bottom line.
CASE 1
Small metalworking company—5 employees
163,800 DKK
savings per year
Payback:
7 months
CASE 2
Medium-sized metalworking company – 19 employees
226,512 DKK
savings per year
Payback:
3 months
CASE 3
Large metalworking company—50+ employees
573,120 DKK
savings per year
Payback:
3 months
CASE 4
Packaging Production – 40+ employees
468,000 DKK
savings per year
Payback:
4 months
Case 1
Small metalworking company
Machining of metal and/or plastic workpieces
5
5 employees
A smaller, more efficient organization
7
7x STAR Long-Turners
Requires I/O modules for data collection
2
2 3-axis CNC machining centers
Part of the overall fleet of machinery
9
9 machines in total
Basis for the calculation
The Challenge
15 hours per month
On average, each machine was idle for 15 hours per month due to downtime or changeover times that lasted longer than expected.
The Solution: PLEET Stop
-20%
PLEET Stop reduces downtime by 20% —equivalent to 3 hours and 45 minutes more production time per machine each month.
1,620 metric tons
819,000 DKK
324 t
163,800 DKK
COSTS FOR PLEET
150,000 DKK
135,000 DKK
NET VALUE
13,800 DKK
28,800 DKK
7 months
7 months
Case 2
Medium-sized metalworking company
Machining of metal and/or plastic workpieces · two-shift schedule
19
19 employees
Several machines are operating on a two-shift schedule
3
3x Long-turners
Requires I/O modules for data collection
4
4 x 3-axis CNC machining centers
Part of the overall fleet of machinery
1
1 x 4-axis CNC machining center
Part of the overall fleet of machinery
2
2 5-axis CNC machining centers
Part of the overall fleet of machinery
10
10 machines in total
Basis for the calculation
The Challenge
12 hours per month
On average, each machine was idle for 12 hours per month due to downtime or changeover times that lasted longer than expected.
The Solution: PLEET Stop
-22%
PLEET Stop reduces downtime by 22% —equivalent to 3 hours and 45 minutes more production time per machine each month.
1,440 metric tons
1,029,000 DKK
317 t
226,512 DKK
COSTS FOR PLEET
165,000 DKK
150,000 DKK
NET WORTH
61,512 DKK
76,512 DKK
3 months
3 months
Case 3
Large metalworking company
Machining of metal and/or plastic workpieces · 3-shift schedule
50+
50+ employees
Several machines are operating on a three-shift schedule
2
2 x Long-turners
Requires I/O modules for data collection
7
7 x 3-axis CNC machining centers
Part of the overall fleet of machinery
8
8 x 4-axis CNC machining centers
Part of the overall fleet of machinery
7
7 x 5-axis CNC machining centers
Part of the overall fleet of machinery
24
24 machines in total
Basis for the calculation
The Challenge
12 hours per month
On average, each machine was idle for 12 hours per month due to downtime or changeover times that lasted longer than expected.
The Solution: PLEET Stop
-20%
PLEET Stop reduces downtime by 20% —equivalent to more than 2½ hours more production time per machine each month.
3,456 t
2,865,000 DKK
691 t
573,120 DKK
COSTS FOR PLEET
366,600 DKK
303,600 DKK
NET WORTH
206,520 DKK
269,520 DKK
3 months
3 months
Case 4
Food Packaging Production
Vacuum forming and injection molding · 3-shift schedule
40+
40+ employees
Several machines are operating on a three-shift schedule
15
15 vacuum forming machines
8
8 injection molding machines
23
23 machines in total
The Challenge
25 hours per month
On average, each machine was idle for 25 hours per month due to downtime or changeover times that lasted longer than expected.
The Solution: PLEET Stop
-25%
PLEET Stop reduces downtime by 25% —equivalent to more than 2½ hours more production time per machine each month.
6,900 metric tons
3,120,000 DKK
1,035 t
468,000 DKK
COSTS FOR PLEET
345,600 DKK
294,600 DKK
NET WORTH
122,400 DKK
173,400 DKK
4 months
4 months
Customer Review:
“We’ve seen a significant improvement in our production since we installed PLEET. The time spent on production downtime has been reduced to such an extent that it’s making a difference on the bottom line.” “
– Claus Kvist, Plant Manager, ST PLAST A/S
Do you have any questions? – Contact us today